Texas Road Bridge Replacement

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Project Location:

This project is located on Texas Road just south of Sand Creek Road.

Project Funding:

Funding for this project comes from the KDOT Local Off-System Bridge Replacement Program ($1,000,000) and Public Works project funds that have been saved over time.

Initial Project Timeline:

  • Notice was received from KDOT on August 31, 2023 that Bridge 17.6-20 was selected for funding through the 2025 Off-System Bridge Program. Read more here
  • Franklin County has hired CFS Engineers to begin the survey and preliminary engineering design for the bridge replacement project
  • Survey work will occur fall 2023 and engineering design work will follow
  • This project is expected to be bid in late 2024 
  • Construction expected to begin in the spring of 2025